303-465-4306 info@allredarch.com

All Projects


Teller Street

Teller Street

The Teller Street project is a 25,500 sq. ft. commercial metal building shell set up for “flex space”.  The exterior building components include a stamped concrete wainscot base, Corten panels and insulated metal panels.  The mezzanine and exterior precast...
ARVADA FIRE STATION #3

ARVADA FIRE STATION #3

A historic brick fire station with two bays was the objective of AFPD’s replacement of station 3 on a very small site. With brick detailing reminiscent of the golden brick architectural era, this small station of 8,800 sq. ft. sits on a small site of 20,950 sq....
CITY OF THORNTON FIRE STATION #1

CITY OF THORNTON FIRE STATION #1

Station #1 is a 26,000 square foot two story fire station and administration building.   The fire station has four apparatus bays, classrooms, offices, a gym & living quarters.   A mezzanine that opens to the apparatus bays serves as onsite training for the fire...
ADAMS COUNTY FIRE STATION #11

ADAMS COUNTY FIRE STATION #11

Station #11 is a 31,200 square foot ” mega station”.  The new fire station has four apparatus bays, classrooms, offices, a gym & living quarters.   A mezzanine that opens to the apparatus bays serves as onsite training for the fire fighters and for...
South Adams Fire Station 4

South Adams Fire Station 4

Station #4 is a 9,920 square foot two story Fire Station that replaced an outdated fire station located on a confined lot adjacent to the existing fleet maintenance facility. The new fire station has nine bunk rooms and office spaces on the first floor with a fitness,...